top of page

Allen

309 Allen, San Dimas

Size

2.58 A.C.

Project Description

Architect/Designer

Existing site: A cluster of residential homes situated on a 112,500 S.F. parcel
Development plans: New 63,749 S.F. multi-tenant warehouse with office and mezzanine
• 57% Coverage
• (6) Dock high and (2) grade lever doors



O.C. Design & Engineering

Construction Type

Concrete Tilt-Up

Project Type

Industrial

CHALMERS EQUITY GROUP ®

© 2023 CHALMERS EQUITY GROUP, ALL RIGHTS RESERVED.

State License No. B-665299

7901 S. Crossway Drive, Pico Rivera, CA 90660  |  Phone: (562) 948-4850

bottom of page